Ancel Brundrett Memorial Pier

Project Description:

The scope of this project for the City of Port Aransas included the construction of a new pedestrian/ community fishing pier with 16” x 16” concrete piles with lengths of 55’ – 70’, along with 12 ea. 13’-6”, 6 ea. 15’-8”, and 1ea. Intersecting precast pile caps. Pier construction began prior to the landside demo and construction, during which crews worked to demolish the existing sidewalk and framework and proceeded to the construction and installation of the pier, which included 852 feet of precast concrete beams, in addition to ADA-compliant handrails and guardrails. 

Project Images
Project Specifications
Award Date: July 30, 2021
Completion Date: September 30, 2022
Location: Port Aransas, TX