Howard Energy – GT Logistics New Ship Dock #2
Howard Energy – GT Logistics New Ship Dock #2 Project Description: During this $20 million project, a steel dock platform, including under deck piping, and an approachway, including 4 pile caps and 4 deck slabs, will be transported, set, and finished. The scope of work also includes transporting, installing, and finishing 4 ea. 84” diameter […]
Ancel Brundrett Memorial Pier

Ancel Brundrett Memorial Pier Project Description: The scope of this project for the City of Port Aransas included the construction of a new pedestrian/ community fishing pier with 16” x 16” concrete piles with lengths of 55’ – 70’, along with 12 ea. 13’-6”, 6 ea. 15’-8”, and 1ea. Intersecting precast pile caps. Pier construction […]
Galveston Wharves Berth 10 Rehabilitation

Galveston Wharves Berth 10 Rehabilitation Project Description: This project included the rehabilitation of a withering concrete pier for Galveston Wharves/Royal Caribbean consisting of concrete pier demolition, installing steel pipe pile, and installing new concrete dolphins and fendering apparatuses. Operations were located at Berth 10 in Galveston, TX. The new design of the pier enables the […]
USCG Rebuild Port Aransas Station

USCG Rebuild Port Aransas Station Project Description: The scope of this competitively bid contract for the United States Coast Guard in Port Aransas, Texas was comprised of the installation and construction of their new Marine Bulkhead Facility. This project consisted of 450 linear feet of sheet pile bulkhead, 300 linear feet of sheet pile deadman […]
Port Lavaca Fishing Pier Replacement

Port Lavaca Fishing Pier Replacement Project Description: The base bid of this project consisted of the demolition of 902 LF of the existing timber pier destroyed during Hurricane Harvey. The pier was constructed of 9’ x 50’ timber T-Head. The next phase included the installation of 910 LF of new treated timber pier built of […]
PCI Nitrogen Ammonia & West Dock

PCI Nitrogen Ammonia & West Dock Project Description: The scope of work for this project consisted of removing and replacing existing breasting dolphin structures with new 48” breasting dolphins at the ammonia dock and structural repairs to the west dock. Ammonia Dock Removal of 7 ea. concrete breasting structures supported by 16 EA timber pilings […]
Enbridge Berth 4 & 5
Enbridge Berth 4 & 5 Project Description: The MODA Midstream Berth 4 & 5 Modifications Project consisted of procuring and installing 20 EA monopiles that serve as new Mooring Dolphins & Breasting dolphins that allow the client to take on large shipping vessels, as well as 2 loading arm platforms that align with the new […]
Enbridge Berth 2A Modifications
Enbridge Berth 2A Modifications Project Description: The MODA Midstream Berth 2A Modifications Project consisted of procuring and installing six monopiles that will serve as new Mooring & Breasting Dolphins that will allow the client to take on large shipping vessels, as well as a loading arm platform that aligns with the reinstated breasting line. The […]
TXDOT Copano Bay Pier Removal

TXDOT Copano Bay Pier Removal Project Description: The scope of work for TXDOT consists of the removal of the original (1931) SH 35 bridge over Copano Bay, Texas. The 1931 SH 35 bridge over Copano Bay was converted to a recreational fishing pier in the 1960s. In 2017, Hurricane Harvey damaged the old bridge/fishing pier […]
TXDOT Ferry Repair Project

TXDOT Ferry Repair Project Project Description: The scope of work for TxDOT Port Aransas Ferry Pilings and Repair Project consist of removing 28 EA pile clusters consisting of 45’- 90’ composite piling and installing 9 EA 110’, 5 EA 80’, 2 EA 60’ and 12 EA 45’ composite piling for new pile clusters. These clusters […]