Project Description:
The FHR Dock 2 Pile Repair project consisted of procuring and installing 20 piles that will serve clients stability for future longevity of dock 2. Client gave Russell Marine 30 days to reach completion, completion was reached in 20 days, 10 days ahead of schedule.
The repair modification consisted of the following scopes of work: Install wooden and metal piles under dock to tie into existing piles, installation of 2 pipe racks under existing pipe running to dock.
Project Images
Project Specifications
Award Date: | July 12, 2022 |
Completion Date: | January 2023 |
Location: | Corpus Christi, TX |