The LBC San Jacinto Maritime College Dock project consisted of the following scope of work: Installation of 151 LF of sheet pile bulkhead that was tied into an existing bulkhead wall. Installation of a sheet pile tie back wall in addition to a whaler and tie rod system, Installation of a barge fender system consisting of 2 48” x 55’ pipe piles with 180 degree wrap fenders and 2 8’ floating fenders. Installation of a concrete slab and handrails. The project was awarded to Russell Marine by LBC Houston Terminals but was a donation to the San Jacinto Maritime College for training.

Project Images
Project Specifications
Award Date: June 8, 2020
Completion Date: September 2020
Location: Seabrook, TX