Magellan Galena Park Ship Dock 2 Connector Wall

Project Description:

The scope of work for Magellan Galena Park Ship Dock 2 Connector Wall consisted of installing 260 LF of HZ combi-wall with 60” x 100’ pipe piles, 80’ sheet piles and full length cap plates with drains. The required backfill of sand and rock between new wall and existing wall all had to be installed by water with no access of equipment by land.

Project Images
Project Specifications
Award Date: September 20, 2019
Completion Date: November 27, 2019
Location: Galena Park, TX