PCI Nitrogen Ammonia & West Dock

Project Description:

The scope of work for this project consisted of removing and replacing existing breasting dolphin structures with new 48” breasting dolphins at the ammonia dock and structural repairs to the west dock. 

Ammonia Dock

  • Removal of 7 ea. concrete breasting structures supported by 16 EA timber pilings
  • Installation of 5 ea. new 48” x 120’ long breasting pile dressed with 120-degree wrap fenders

West Dock

  • Install 25 ea. grout-filled timber pile wraps 12’ long x 24” diameter
  • Concrete repair work to loading tower structure with 2-4” grout overlay
  • 4 ea. base plate and steel cross bracing repairs
Project Images
Project Specifications
Award Date: February 20, 2020
Completion Date: August 13, 2020
Location: Pasadena, TX