Port of Beaumont Grain Dock Replacement

Project Description:

The Port of Beaumont Grain Dock Replacement Project consists of three main phases; demolition of existing Bulmer Towers / Concrete Wharf, Dredging, and re-build a multi-purpose concrete dock.  The scope of work for project generally includes: removal of 3 existing Bulmer Towers and supporting foundations, remove 600 LF of concrete wharf, fully extract piles, dredge / widen dock area, drive precast pile, cast-in-place concrete caps and deck, breasting / mooring dolphins, electrical service, and fire water system. The intent of the project is to provide the Port of Beaumont with a multi-purpose loading dock that can withstand the size of incoming vessels. 

Project Images
Project Specifications
Award Date: September 29, 2022
Est. Completion Date: March 28, 2023
Location: Beaumont, TX